EggerManned electric elevatorAll kinds of functions you don't know

announcer:hp935HP175192871 release time:2024-01-28 12:03:29

The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology, and the top layer is not affected. It can be customized according to the location and environment.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver it can cause the car to descend to the nearest floor position and open the door

Egger.Check the starter potential when the lifting table is not raised or the voltage is too low when the motor load is working. Voltage hydraulic range allowed&

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, the landing door shall not be opened.


EggerManned electric elevatorAll kinds of functions you don



Installation and dismantling personnel and drivers should hold certificates to work.

Is the water cooling and air cooling of the hydraulic station the same?

The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform,EggerTatami electric elevator, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

Honesty is the foundation.The scaffolding of the parking platform should be laid tightly and firmly.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.


EggerManned electric elevatorAll kinds of functions you don



The landing door should meet the requirements of the specifications and achieve standardization.

Customer first.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Construction electric elevators should be equipped with safety devices to prevent the cage from falling. The anti fall safety device should be functional at all times,EggerSmall electric loading elevator, including installation, disassembly, and before resetting after action. Fall arrest safety gear

Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.

Egger.Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories, and

Setting requirements: For construction electric elevators that operate in multiple shifts, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Before installation, the installation unit should confirm that the foundation foundation bearing capacity,EggerElectric banner elevator, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.