Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Taranto.The shutdown device (emergency stop switch) should be non automatic reset type.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

.The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Electric elevators used in various places.


TarantoElectric tatami elevatorThe incentive and cutting has its particularity



When the wall bracket adopts non matching standard products, design calculations should be carried out.

Attention should be paid to the occurrence of oil leakage on the aluminum alloy lifting platform to avoid secondary damage caused by a shortage of hydraulic oil. Overloading work is prohibited during use

When the landing door is closed, the full width of the lifting passage opening should be covered.

middleman.Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

During normal operation the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.


TarantoElectric tatami elevatorThe incentive and cutting has its particularity



The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator,TarantoPure electric curved arm elevator,TarantoElectric pillar elevator, with a size of 8 meters by 2 meters.

Job description.Mechanical devices controlled by cage movement should not be used to open or close the landing door.

The device should be used within the valid calibration period and operate effectively and reliably. The anti fall safety device should have a valid inspection certificate (or inspection report), and the validity period should not exceed 1 year. Anti fall safety devices have been manufactured for five years

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

Taranto.Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform,TarantoElectric barrier free elevator, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.