02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device, In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor, and diesel engine dual power.

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

Kaiserslautern.Check and clean the driving gears and guide wheels of the elevator. If there is excessive wear, it is necessary to replace them

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

.The arrangement of vibration points should be based on the vibration aging process standard GB/T25712-20. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.

However, large welded structural components have the characteristics of complex morphology, large weight large differences in residual stress size and distribution, and it is difficult to achieve good results using ordinary vibration aging technology. Therefore, it is crucial to develop a reasonable process. Therefore, they found Nanjing Juhang and our JH-700 vibration aging equipment and requested us to develop a complete vibration aging process.

The vibration frequency should be set to obtain large dynamic stress with low energy consumption, and the resonance frequency should be used to handle time dependent vibration. However, and using resonance peaks with higher peaks and lower frequencies for aging can achieve optimal results. The resonance frequency needs to be determined by trial vibration, which slowly increases the speed of the excitation motor from 0, and determines the relationship curve between the amplitude of the workpiece and the motor speed to determine the resonance point of the workpiece. According to the scanning curve, a large acceleration was obtained at 5366r/min, so 5366r/min was determined as the aging frequency.


Kaiserslautern10 ton mobile boarding bridge manufacturerSmall price fluctuations



The safety control voltage of 18 is selected with rolling guide shoes, high accuracy, wear resistance, and stable lifting. The characteristics of the Jinchuang lifting platform are as follows: 1. There is no need for a machine room above the shaft. 2. The hydraulic elevator is not equipped with a counterweight device to improve the utilization rate of the shaft area. 3. The load and load cylinder of the hydraulic elevator directly act on the foundation pit, and the strength requirements of the shaft are low, Brick or brick concrete structure hoistway can be used for Jinchuang lifting platform safety and stability advantages. Overflow valve: It can prevent system pressure from being too high during upward movement. Emergency manual valve: In case of power failure, it can make the elevator emergency descend to the nearest floor position and open the door.

Knowledge of pressure lifting platforms, boarding bridges, mobile elevators, and more is available in Jiuheng, Jinan. We sincerely welcome colleagues from all walks of life to visit and inspect the factory, cooperate and negotiate, and seek common development. The following maintenance and upkeep are required for the lifting cargo elevator: Maintenance and upkeep: Maintenance and upkeep should be carried out by the equipment operator or full-time personnel of the operating unit. The equipment maintenance and upkeep unit is responsible for supervising and reviewing the maintenance content. The main content of maintenance and upkeep is summarized as follows:; amp; quot; Cross operation method; amp; quot;: Clean, tighten, smooth, adjust, and prevent corrosion. Before and at the end of each shift 10 to 30 minutes before and after each day, inspect all parts and components of the equipment to ensure they are normal. Apply oil smoothly according to rules, pay attention to the sound of mechanical operation and do a good job in cleaning and handover to achieve the goal of clean appearance and normal operation of the equipment. Maintenance and handover records should be made in a fixed form and used for management

During aging treatment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend, indicating that the damping inside the component decreases after vibration treatment, so the amplitude gradually increases; Since then, the amplitude change has been basically stable,KaiserslauternCylinder mounted hydraulic lifting platform, indicating that the structure of molecules inside the component tends to be stable, which conforms to the judgment standard of curve observation strip, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation,KaiserslauternMobile boarding bridge price, and hang it in a prominent position. When working on an electric lifting platform, and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy12 drivers must carefully check the electrical, hydraulic,KaiserslauternScissor fork lifting platform movement, and mechanical systems of the platform, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

How much is it.Applicable environment: Indoor or outdoor Applicable temperature: Safety device Safety rocker: When the equipment is running and rising, the rocker will automatically prevent wheelchair platform.

According to calculations, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.

Outbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, and are linked to operate the platform up and down.


Kaiserslautern10 ton mobile boarding bridge manufacturerSmall price fluctuations



The second method is the protective layer method, which covers the metal surface of the aluminum alloy lifting platform with a protective layer to isolate the metal products from the surrounding corrosive medium and prevent corrosion. Apply engine oil, paint, or cover the surface of steel parts with corrosion-resistant non-metallic materials such as enamel and plastic; Using electroplating, hot plating, spray plating, to coat the surface of steel with a layer that is not easily corroded

Latest consultation.Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

  

The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex, and residual stress is inevitably generated during the manufacturing process. In order to prevent deformation of the components due to changes in residual stress during use, it is necessary to perform stress relief treatment on the completed components.

Kaiserslautern.Vibration aging treatment and effect judgment: According to the aging process plan, after setting the support points and vibration pickup points of the workpiece, use a rigid fixture to fix the exciter on the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, so the excitation force is selected as the fourth gear.

Vibration aging treatment and effect judgment: According to the aging process plan, after setting the support points and vibration pickup points of the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, so the excitation force is selected as the fourth gear.

Outbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, and are linked to operate the platform up and down.