BisegliAluminum alloy automatic lifting platformReduce radioactive pollution

announcer:hp275HP127226562 release time:2024-07-13 14:50:33

Jinchuang lifting platform product feature 01 is mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and a lifting height of 1-25 meters, a guide rail elevator, also known as a hydraulic elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, has low noise, is convenient for maintenance and has a long service life. In case of a power outage, manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm, The 04 pump station can be customized according to the on-site environment, suitable for 2-3 floors of steel structures or concrete factories. Both the internal and external parts can be used. The 05 pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The 06 oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers, The oil leakage problem of components 07. The oil cylinder is built into the platform 08. The heavy-duty steel wire rope wheel or weighted special chain ensures safety 09. The automatic insurance during the lifting process ensures vehicle safety 10. The synchronous device during the lifting process ensures that the vehicle may not overturn 11. The alarm setting before falling to the ground ensures the safety of the operator 12. The chain or steel wire rope fracture protection device 13. The hydraulic system pressure loss prevention protection device 14. The elevator special flat layer permanent magnet switch is selected, The leveling effect is good. 15. The distance between heavy and empty loads is small, and the leveling accuracy is high. 16. Standard elevator boards, LCD display call boxes, relevant wiring harnesses, and connectors are selected. Beautiful appearance, easy operation, visual display of the position of the elevator car on the floor, wiring harness connected using connectors, with automatic and manual options.

The design of support points for selecting process parameters is to avoid energy consumption and noise generation due to collision between components and supports during vibration. The supports should be arranged near the nodal line, and the layout principle is: when the aspect ratio of the component is greater than 2, two point supports can be used; When the aspect ratio is close to 1, it is advisable to use or 4-point support.

Bisegli.  ?? Hidden danger investigation relies on joint efforts from all aspects:?? Construction enterprises are the main responsibility for identifying hidden dangers in construction elevators. They should strengthen daily inspections and regular inspections, and carefully inspect the steel structure, safety protection devices, electrical devices, the structural shape is complex, and residual stress is inevitably generated during the manufacturing process. In order to prevent deformation of the components due to changes in residual stress during use, it is necessary to perform stress relief treatment on the completed components.

.Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, the emergency stop switch can be used to stop the platform. However, during normal operation, it is prohibited to use the emergency stop switch to stop the platform.

Low failure rate: Due to the use of advanced hydraulic systems and good methods, the failure rate of elevator operation can be minimized. Low power consumption: When the hydraulic elevator descends, it is driven by the pressure generated by its own weight, which greatly saves energy.


BisegliAluminum alloy automatic lifting platformReduce radioactive pollution



Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit mainly consists of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation, all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity, and the lifting cage and driving mechanism are installed in the guide rail frame respectively, power on the suspension cage until it rises 1m above the ground or detaches from the ground buffer spring (or support), the adjustment and sequence are as follows: 1. Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to maintain the installation surface of the mechanism perpendicular to the horizontal plane, and make the upper and lower pendulum wheels evenly guide the rails at the same time. Rotate each wheel body by hand to check if it evenly presses the rails; 2. Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to 0.2; Between 0.5mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of 0.2-0.5 ram with the guide rail; 4. Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator,BisegliAluminum alloy double column lifting platform, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune 6 pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in 1 appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the lower swing wheel (single or double wheel) should be adjusted to move the lower part of the driving mechanism towards the direction of the guide rail until the area of the spots reaches more than 85% of the surface of the gear rack. The smaller the area, the easier it is to damage the gears and racks.

Now with the arrival of summer, the aluminum alloy lifting platform will certainly suffer from high temperature and rainstorm in summer. It is easy to rust after a long time under this condition, which will seriously shorten the service life of the equipment and cause safety problems. So how should we prevent equipment rust?

Create brilliance.The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex, and residual stress is inevitably generated during the manufacturing process. In order to prevent deformation of the components due to changes in residual stress during use, it is necessary to perform stress relief treatment on the completed components.

The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex,Bisegli8 ton movable boarding bridge,BisegliMobile boarding bridge 10 tons, the structural shape is complex it is necessary to perform stress relief treatment on the completed components.

Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.


BisegliAluminum alloy automatic lifting platformReduce radioactive pollution



The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, and residual stress is inevitably generated during the manufacturing process. In order to prevent deformation of the components due to changes in residual stress during use, it is necessary to perform stress relief treatment on the completed components.

Inspection environment.Now with the arrival of summer, which will seriously shorten the service life of the equipment and cause safety problems. So how should we prevent equipment rust?

The cleaning oil for the hydraulic system must use hydraulic oil of the same brand as the system used, with an oil temperature between 45 and 80 ℃. Use a large flow rate to remove impurities from the system as much as possible. The hydraulic system needs to be cleaned repeatedly three times or more. After each cleaning fully drain the system while the oil is hot.

Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

Bisegli.The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation, the emergency stop switch can be used to stop the platform. However, during normal operation, it is prohibited to use the emergency stop switch to stop the platform.

Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.

According to calculations, when the support points of the beam type components are located along the length of 1/9L on both sides the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.