PreacherTilting lifting platformWhat are the models

announcer:hp275HP127226562 release time:2024-02-22 14:01:19

The second method is the protective layer method, which covers the metal surface of the aluminum alloy lifting platform with a protective layer to isolate the metal products from the surrounding corrosive medium and prevent corrosion. Apply engine oil, petroleum jelly, paint, or cover the surface of steel parts with corrosion-resistant non-metallic materials such as enamel and plastic; Using electroplating, hot plating, spray plating, etc., to coat the surface of steel with a layer that is not easily corroded

Emergency stop: Press the emergency button switch to raise or lower the machine.

Preacher.Check the fastening status of the wall bracket support rod, and bolts and retaining rings between the lifting cargo elevator and the bridge. If they are loose or displaced, they should be checked and tightened

The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex, and residual stress is inevitably generated during the manufacturing process. In order to prevent deformation of the components due to changes in residual stress during use, it is necessary to perform stress relief treatment on the completed components.

.02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device, In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor,PreacherDouble column aluminum alloy lifting platform, and diesel engine dual power.

Outdoor guide rail lifting platform, mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and an elevation of 1-25 meters, guide rail elevators, also known as hydraulic elevators, can be installed indoors and outdoors. They have a high lifting height and use side mounted oil cylinders, ensuring smooth operation, low noise, convenient maintenance, and long service life. In case of power failure manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm. Professional elevator manufacturers have high pressure resistance, good waterproof performance, and fire and high temperature resistance, radiation resistance, long service life. The top layer height is not affected, and can be customized according to the on-site environment. It is suitable for 2-3 story steel structures or concrete factories, and can be used both internally and externally.

Thermal aging stress relief is generally suitable for small workpieces,PreacherScissor type mobile hydraulic lifting platform, while the lifting foundation structure has a large volume and does not have a large enough annealing furnace. Using natural aging takes one year and the production cycle is too long, so neither of these two methods is feasible. After research and understanding by the manufacturer, it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore, the manufacturer has decided to use vibration aging for stress relief of the platform lifting foundation. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!


PreacherTilting lifting platformWhat are the models



The selection of vibration pickup points refers to the placement point of the sensor, the acceleration sensor should be placed on the workpiece with a certain rigidity and a large amplitude, and its testing direction should be adjusted to be perpendicular to the plane where the effective zone of the vibration mode is located. Considering the complex structure of the lifting foundation workpiece and the uneven thickness of each component, the vibration pickup point is set in a thick area in the middle of the component.

Check all standard sections and diagonal support connection points. Check the fastening bolts of the gear rack and ensure that the motor cooling wing plate and organization are clean

Emergency stop: Press the emergency button switch to raise or lower the machine.

Welcome to inquire.Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.

The vibration frequency should be set to obtain large dynamic stress with low energy consumption and the resonance frequency should be used to handle time dependent vibration. However, there may be one or more resonance peaks in large components, and using resonance peaks with higher peaks and lower frequencies for aging can achieve optimal results. The resonance frequency needs to be determined by trial vibration, which slowly increases the speed of the excitation motor from 0, and determines the relationship curve between the amplitude of the workpiece and the motor speed to determine the resonance point of the workpiece. According to the scanning curve, a large acceleration was obtained at 5366r/min, so 5366r/min was determined as the aging frequency.


PreacherTilting lifting platformWhat are the models



Outbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, and are linked to operate the platform up and down.

Installation material list.Emergency stop: Press the emergency button switch to raise or lower the machine.

Ensure that the small gear and pressure wheel are securely fastened on the drive base plate, and check the fixing condition of the drive base plate bolts

Low failure rate: Due to the use of advanced hydraulic systems and good methods, the failure rate of elevator operation can be minimized. Low power consumption: When the hydraulic elevator descends, it is driven by the pressure generated by its own weight, which greatly saves energy.

Preacher.Vibration aging treatment and effect judgment: According to the aging process plan, after setting the support points and vibration pickup points of the workpiece, use a rigid fixture to fix the exciter on the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, it is necessary to start from the source. The current technology is relatively advanced. When manufacturing aluminum alloy lifting platforms,PreacherTrailer folding arm lifting platform, which steel should be chosen for production? Because there are many corrosion-resistant steel materials now, adding chromium, nickel, etc. to ordinary steel to make stainless steel, changing the internal structure of the metal to prevent rust.

The selection of vibration pickup points refers to the placement point of the sensor, which is used to measure the vibration amplitude of the workpiece. According to GB/T25712-2010, the acceleration sensor should be placed on the workpiece with a certain rigidity and a large amplitude and its testing direction should be adjusted to be perpendicular to the plane where the effective zone of the vibration mode is located. Considering the complex structure of the lifting foundation workpiece and the uneven thickness of each component, the vibration pickup point is set in a thick area in the middle of the component.