Harlem 8-meter hydraulic lifting platformThe output value is still high

announcer:hp695HP135175170 release time:2023-12-17 12:11:18

The sinking of a cargo elevator is a phenomenon where the table surface drops due to gravity after a certain period of time when it rises to a designated position. Of course, this problem is definitely abnormal. So how can we solve it? The first step is to identify the cause. Below, and the contact crater should be polished in a timely manner.

Harlem .The reason for the price of aluminum alloy lifting platforms is that hydraulic pumps are also a factor affecting the flow of hydraulic oil. Using hydraulic pumps that have been used for too long can easily lead to problems. When the speed of the hydraulic elevator platform slows down, it is necessary to check whether the oil supply flow rate of the hydraulic pump remains unchanged. If there is an invention problem contact the manufacturer in real time to avoid exceeding the warranty period.

Good stability: The overflow valve can prevent excessive system pressure during upward movement. Emergency manual valve: In case of power failure, it can cause the elevator car to descend to the nearest floor position and open the door. Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position; Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops.

.Pay attention to checking each steel wire rope for broken wires and loose strands. If it exceeds the relevant regulations, it must be replaced immediately. The maintenance and upkeep of steel wire ropes should strictly follow the 85 regulations.

When personnel enter the interior of the lifting platform for maintenance of outdoor elevators, they must hang the elevator to prevent sudden lowering of the platform and causing casualties.

Familiarity with the usage process and without a doubt, this is the first thing to understand. There are two ways to understand it: first, carefully read the user manual provided by the manufacturer when the hydraulic lifting platform leaves the factory; The second is the equipment that needs to be installed. A professional installation technician will be dispatched to install the hydraulic lifting platform. After the installation is completed, relevant users will be trained on the operating process and safety precautions of the hydraulic lifting platform, and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components, there may be subtle deviations in shape and size that require a period of time for running-in. Therefore, during the running-in period, it is necessary to pay attention to whether there is any rapid wear. If there is any, the manufacturer of the hydraulic lifting platform should handle it in a timely manner to avoid equipment failure; Work between the pins and bearings to ensure that they are not worn, and add some engine oil or grease appropriately; Confirm if there is any noise during the running-in period. If it is found that the hydraulic lifting platform is noisy during operation, there is no need to worry in the early stage. If there are no major problems, run it several times more. After the running-in, the noise will naturally disappear. However,Harlem Electric hydraulic lifting platform, if there is noise for a long time and no signs of fading, please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, nuts, retaining rings, oil pipe joints, etc. If there are any, please reinforce or replace them in a timely manner to avoid accidents.


Harlem 8-meter hydraulic lifting platformThe output value is still high



The inconsistent production dimensions of the hydraulic lifting platform support rods are a quality defect of the lifting platform equipment itself. It is recommended that the manufacturer replace them,Harlem Hydraulic lifting platform, as the probability of this situation occurring is relatively low.

The cleaning of the elevator manufacturer requires that all parts of the elevator should be kept free of oil sludge dirt and dust, especially the air, fuel and oil filter of the engine should be checked and cleaned according to the specified time to prevent impurities from entering the cylinder and oil passage, so as to accelerate the wear of moving parts. Elevator manufacturers suggest developing some maintenance systems. The regular maintenance system is based on the wear and service life of mechanical components, as well as the wear and tear patterns of oil and liquid. The maintenance system mainly determines the maintenance needs of the machinery based on the operating hours of the machinery, the arrival time is within 30 minutes.

The load capacity of goods and the tonnage of goods transported at once also affect the speed of lifting and lowering. Achieving the excellent value of the lifting platform for transporting goods is a guarantee of speed. If the weight is too heavy the staff should carefully inspect the hydraulic and electrical systems to ensure that there are no leaks or bare leaks before use.

technical service.According to Beijing regulations, it affects the speed. If the goods are too light, it also affects the normal transportation time.

Maintain a smooth access road for external construction elevators and sufficient parking space for equipment. When using a crane for auxiliary installation, if encountering an unsolvable problem with a hydraulic lifting platform, it is better to produce it quickly and conveniently, and guide the manufacturer to solve it. Please pay attention to safety precautions during maintenance.

Bidding.No matter what problem occurs if encountering an unsolvable problem with a hydraulic lifting platform, it is better to produce it quickly and conveniently, and guide the manufacturer to solve it. Please pay attention to safety precautions during maintenance.

Hydraulic lifting platforms are widely used in factory maintenance, municipal construction, and decoration of hotels in industrial and mining enterprises,Harlem Two ton hydraulic lifting platform, with reliable quality and perfect performance.

How to install and use the bearings of the elevator? During the process of using the bearing device of the elevator, we cannot always ensure that the bearing device has the right orientation, which inevitably leads to some devices not being in place or bearing displacement. Once these problems occur in the device, it will cause the clearance between the bearings to become too small, and then make it impossible for the inner and outer rings of the bearings to be in the same rotation center. So it is necessary to use specialized tools when installing bearings, and in the future, in order to ensure the success of the bearing installation.

Harlem .What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

The lifting platform has been inspected and debugged before leaving the factory, and all technical indicators meet the design requirements. When in use, only the power supply needs to be connected, and the hydraulic and electrical systems basically do not need to be adjusted.

Every month, it should be ensured to add butter twice to the transmission position where the grease nipple is located. For areas where butter cannot be added, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, it is prohibited to use the equipment.