Jinzhong6-12 meter fully automatic elevatorPrice may rise

announcer:hp935HP175192871 release time:2024-01-11 14:35:22

JinzhongElevator electric 6 meters,

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, if

Use floor doors and cage door devices on construction sites where conditions permit.

.Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door


Jinzhong6-12 meter fully automatic elevatorPrice may rise



It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easier

Aluminum alloy lifting platforms can be divided into single column aluminum alloy, cargo elevator, double column aluminum alloy, three column and four column aluminum alloy. Can be used in factories, automated warehouses, parking lots, municipal facilities, docks, buildings and installations

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

Focus on Development.Later, when there is a major malfunction of the lifting platform it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

Before installation, the installation unit should confirm that the foundation,Jinzhong200 kg electric elevator, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

The quality of the standard section should comply with the product manual and specification requirements.


Jinzhong6-12 meter fully automatic elevatorPrice may rise



Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, and then turn the transmission handwheel to lower the plug and achieve sealing.

Marketing Department.Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

Precautions during operation: Mechanical operations should be gentle and smooth, and mechanical operations should be avoided, otherwise impact loads will inevitably occur, causing frequent mechanical failures and greatly shortening the service life. Generated during homework

The scaffolding of the parking platform should be laid tightly and firmly.

Jinzhong.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities,JinzhongElectric barrier free elevator, creating unexpected atmosphere and effects according to the needs of the plot. For example using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.