IseronElevator scissor electricAutomatic sealing performance characteristics

announcer:hp935HP175192871 release time:2024-01-05 09:50:50

Setting requirements: The landing door should be standardized and tooled.

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength stability, etc., and the production should meet the design requirements.

Iseron.The working principle of the aluminum alloy lifting platform is that hydraulic oil is composed of a vane pump to form a certain pressure, which enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve

To ensure safe and reliable braking of the lifting platform and prevent accidents,IseronGuide rail electric elevator, a hydraulic control one-way valve, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

.The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.


IseronElevator scissor electricAutomatic sealing performance characteristics



Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Attention should be paid to the occurrence of oil leakage on the aluminum alloy lifting platform to avoid secondary damage caused by a shortage of hydraulic oil. Overloading work is prohibited during use

The use of standard section connecting bolts should comply with the user manual and specification requirements.

Inspection standard.Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Implementing multiple shifts of homework should fill in and submit records according to regulations.

The setting of the cable guide frame should comply with the user manual and regulatory requirements.


IseronElevator scissor electricAutomatic sealing performance characteristics



When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

Convenient and efficient.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

The safety overtravel of limit switches and upper limit switches should comply with regulatory requirements.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Iseron.Installation and dismantling personnel and drivers should hold certificates to work.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points and can be controlled up and down floors to achieve safe use.