Installation and dismantling personnel and drivers should hold certificates to work.

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

Dortmund.Aluminum alloy lifting platforms can be divided into single column aluminum alloy, cargo elevator, double column aluminum alloy, three column and four column aluminum alloy. Can be used in factories, automated warehouses, parking lots, municipal facilities, docks, buildings, and installations

It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations,DortmundElectric elevator 200kg, the user unit shall organize the leasing unit, installation unit and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

Mechanical devices controlled by cage movement should not be used to open or close the landing door.


DortmundElectric scissor type lifting platformStandards implemented



High lifting height, using side mounted oil cylinders, stable operation noise free, easy maintenance, and longer service life.

High altitude operations and maintenance in areas such as repair, logistics, electricity, transportation, petroleum chemical, hotel, sports center, mining,DortmundElevator electric elevator, and enterprise. The lifting system of the lifting platform is driven by hydraulic pressure, also known as hydraulic lifting

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Statistics.The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.


DortmundElectric scissor type lifting platformStandards implemented



Secondly,DortmundMicro electric hoist, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

Customer first.When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

Setting requirements: A limit switch should be set at both the upper and lower ends of the stroke, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers), so that the suspension cage can stop

Advantages of electric elevator rotary valve: Simplify the installation of electric elevator pipelines; The operation is more convenient, and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure, small size, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.

Dortmund.The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

The L distance depends on the selected wall mount model.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.