dadSubminiature electric elevatorCompanies need to consider the balance of interests

announcer:hp935HP175192871 release time:2023-12-17 11:05:57

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

dad.And prevent it from starting normally. There should be no device that allows users to cancel warning signals.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings,dadMultifunctional electric elevator, oil cylinder pin shafts and bearings, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

.Work is essential, and the main protective accessories include safety belts, protective covers, platforms and stairs, etc.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

During loading and unloading the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.


dadSubminiature electric elevatorCompanies need to consider the balance of interests



When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

The detailed reason why water cannot be used to flush the hydraulic station is that doing so will corrode the oil tank in the hydraulic station, and once water is mixed in the hydraulic station, it will simply form pipeline corrosion, water vaporization, and other phenomena that can cause adverse effects or results for hydraulic electric elevators. Therefore, it is necessary to prevent such actions to ensure the normal operation and service life of the hydraulic station.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

Quality department.High lifting height, using side mounted oil cylinders, stable operation, noise free, and longer service life.

Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed,dadElectric mobile elevator, its cabin should be full of doors,dadSmall and simple electric elevator, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.


dadSubminiature electric elevatorCompanies need to consider the balance of interests



Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

query.Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

Steel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the lifting cage until it is approved by a professional

Protective measures should comply with regulatory requirements.

dad.For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, a T-shaped stage, or a hall.