JiangxiMicro electric elevatorPrecautions for use

announcer:hp935HP175192871 release time:2023-11-06 18:16:03

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, etc.

The landing door should meet the requirements of the specifications and achieve standardization.

.The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.


JiangxiMicro electric elevatorPrecautions for use



The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

Construction electric elevators should be equipped with upper limit switches that are sensitive and reliable.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Where is it.According to the needs of different performance genres, the form of the stage can be changed. For example using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an intermediate stage, a T-shaped stage or a hall.

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

When the wall bracket cannot meet the requirements of the construction site,JiangxiElectric tripod elevator,JiangxiDC electric elevator,Jiangxi8 meter electric elevator, it should be designed and calculated separately.


JiangxiMicro electric elevatorPrecautions for use



Installation and dismantling personnel and drivers should hold certificates to work.

Create brilliance.When the landing door is closed, the full width of the lifting passage opening should be covered.

Setting requirements: Construction electric elevators should be equipped with up travel (limit) switches.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Jiangxi.When the wall bracket adopts non matching standard products, design calculations should be carried out.

The scaffolding of the parking platform should be laid tightly and firmly.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.