Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, we can extend the oil cylinder to the high position for filling. When filling, the lifting platform should not exceed the high position, and then retract the oil cylinder back to the low position to check if the hydraulic oil level is lower than the low position,GhentGuide rail electric elevator, and maintain it between the two.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

.Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove rubber or sponge from the buffer and cabin to increase their impact energy; Rope groove slipping and other accidents caused the car to suddenly fall, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator, there should be a safety device (such as a safety stop pin) to prevent people from suddenly falling when loading and unloading goods in the car; Electric elevators with three or more floors (including three floors) for passengers or passengers.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).


GhentWarehouse electric elevatorClick to view



When the wall bracket adopts non matching standard products, design calculations should be carried out.

The movement of its related components is direct.

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Product line.When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

During normal operation the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.


GhentWarehouse electric elevatorClick to view



The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Quality risk.The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

Is the water cooling and air cooling of the hydraulic station the same?

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

Ghent.The quality of the standard section should comply with the product manual and specification requirements.

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking,GhentElectric clothes drying elevator, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure,Ghent10 meter electric lifting platform, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.