all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

The use of a lifting platform as a tool for storing performance blankets, soft scenery etc. In some theaters,Hamburg Ames buetterElectric lifting scissor lift, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.

Hamburg Ames buetter.The cargo is 0.5m.

Electric elevators used in various places.

.As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points, and can be controlled up and down floors to achieve safe use.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.


Hamburg Ames buetterElectric brick elevator on construction siteWhat are the matters needing attention in installation



The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

Setting requirements: The up travel (limit) switch should be able to automatically stop the cage running at the rated speed before reaching the upper limit switch, but should not trigger the up travel (limit) switch as high

Stage equipment safety door. To prevent personnel from extending their heads, hands,Hamburg Ames buetterExternal wall electric elevator, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors,Hamburg Ames buetterSmall car electric elevator, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

Inspection environment.Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

The quality of the standard section should comply with the product manual and specification requirements.


Hamburg Ames buetterElectric brick elevator on construction siteWhat are the matters needing attention in installation



Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Test method.The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

When using lifting equipment, the workbench should be kept in a horizontal state.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, etc.

Hamburg Ames buetter.The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.