TucsonElectric elevator factoryHow to effectively remove impurities

announcer:hp935HP175192871 release time:2024-07-13 17:58:21

There is no need to set up a computer room above the shaft like an elevator and the top floor height can be installed at least 2.5 meters.

Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

Tucson.And the decoration team is also using aluminum alloy electric elevators. What safety considerations should we consider during the use process? Many manufacturers have not clearly indicated it. Today,TucsonElectric four-wheel elevator, the mechanical editor will talk to you about aluminum alloys

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

.When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting low noise, long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.


TucsonElectric elevator factoryHow to effectively remove impurities



Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

It is strictly prohibited to use travel limit switches as switches to stop operation.

Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed,TucsonElectric one ton elevator, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

Installation material list.Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than 0.75m; If the rated speed is not greater than 0.7m/s, the safety distance can be 0.40m.

Setting requirements: The landing door should be standardized and tooled.


TucsonElectric elevator factoryHow to effectively remove impurities



The pump body adopts an integrated pump station, which can also be selected according to customer requirements to meet customer ideal requirements.

Promotion.The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform, rate of increase and decrease. To ensure safe and reliable braking and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to prevent hydraulic pipelines from exploding and self locking safely. Installed overloaded voice control alarm

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

Tucson.Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion Terrace, Tower, Pavilion; Ideal props.

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable,TucsonMobile small electric elevator, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.

In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings, a half height middle crossbar