Ajka3 meter electric elevatorWhich human tissues are protective

announcer:hp935HP175192871 release time:2024-06-23 13:30:30

AjkaElectric hydraulic elevator platform,AjkaElectric guide rail elevator,

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

Implementing multiple shifts of homework should fill in and submit records according to regulations.

Ajka.When charging, it is necessary to charge it in a timely manner. When the equipment is used for about 2 months (according to the actual frequency of use), it is necessary to add grease to the rotating parts once; Regularly inspect the working status of the pin shaft of the fully self-propelled electric elevator every month, and if any pin shaft is found

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Mechanical devices controlled by cage movement should not be used to open or close the landing door.

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.


Ajka3 meter electric elevatorWhich human tissues are protective



Protective measures should comply with regulatory requirements.

Setting requirements: Steel wire rope electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the cage until it passes through the

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts,AjkaElectric small elevator, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

Workshop cost.Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

Work is essential, guardrails, protective covers, platforms and stairs, etc.

The use of standard section connecting bolts should comply with the user manual and specification requirements.


Ajka3 meter electric elevatorWhich human tissues are protective



The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

technological innovation.From the perspective of the safety performance of the machinery itself, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

Construction electric elevators must be equipped with lifting cages and reusable buffers and comply with regulatory requirements.

Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

Ajka.Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame scissors, wiring, the door may not meet the above requirements, but safety should be maintained.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).