EmerodFully electric self-propelled elevatorStrengthen process control and promote production

announcer:hp935HP175192871 release time:2024-06-16 14:06:45

occupying a relatively small area, improving the utilization rate of the wellbore area.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

Emerod.The safety overtravel of limit switches and upper limit switches should comply with regulatory requirements.

During the use period,EmerodElectric water gate elevator, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

.Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

The verticality of the guide rail frame should meet the requirements of the specifications.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.


EmerodFully electric self-propelled elevatorStrengthen process control and promote production



Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

The magnetic directional valve returns to the fuel tank. To ensure stable landing of heavy objects and safe and reliable braking,EmerodElectric cargo elevator, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the landing speed does not change due to heavy objects. It is adjusted by the saving valve

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

OK or not?.Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.

Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical passenger car doors, with a size of 8 meters by 2 meters.

Safety and health.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.


EmerodFully electric self-propelled elevatorStrengthen process control and promote production



The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, it is advisable to place the screw at the bottom and the nut at the top.

The pressure joint between the pipe joint and the rubber hose fails prematurely,EmerodElectric cargo elevator, causing oil leakage or pipe explosion. The oil temperature rises due to frequent action of the overflow valve.

Use floor doors and cage door devices on construction sites where conditions permit.

Emerod.The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than 0.75m; If the rated speed is not greater than 0.7m/s, the safety distance can be 0.40m.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.