El PragueElectric elevator 5 metersInstallation manuals and methods

announcer:hp935HP175192871 release time:2024-06-11 15:12:53

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented,El PragueElectric banner elevator, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening,El PragueElectric background axis elevator, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

El Prague.When using lifting equipment, the workbench should be kept in a horizontal state.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

.In order to meet the needs of contemporary audiences and achieve perfect effects, in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, suspension points, lighting bridges, lighting suspension cages, and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout meeting the needs of stage design and choreographers, creating special atmosphere and effects, but also have an overflow valve to prevent excessive system pressure during upward movement


El PragueElectric elevator 5 metersInstallation manuals and methods



Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

The safety overtravel of limit switches and upper limit switches should comply with regulatory requirements.

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Where can I find it?.Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight greatly saving energy and reducing consumption.


El PragueElectric elevator 5 metersInstallation manuals and methods



Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

High value.The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

The isolation and buffering rubber in various parts of the aluminum alloy electric elevator drive device are intact and tightly fitted.

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door,El PragueElectric cargo elevator, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

El Prague.The setting of the cable guide frame should comply with the user manual and regulatory requirements.

The setting of the cable guide frame should comply with the user manual and regulatory requirements.

For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.