KefeldDC electric elevatorWhat are the technical conditions for selection and design

announcer:hp935HP175192871 release time:2024-05-26 14:13:37

making high-altitude operations easier

Kefeld.Electric lifting machinery, has a high social status and has now become an irreplaceable operational tool in our mainstream goods. The hydraulic pump station is the heart position of electric lifting machinery, which greatly tests the professionalism and attention of operators. It is our common responsibility to inspect it and ensure the daily use of machinery. Let's take a look at a few common sense issues: the manufacturer of electric elevators is to ensure the correctness of the power connection, and there should be no misconnection or leakage; Pay attention to cleaning work in daily life and do not allow stains to corrode it; When standing still, regular maintenance should be carried out to prevent the impact of rain and snow weather; Overloading is the first thing that operators must comply with; Iron Law&# quo;; The adjustment of the solenoid valve cannot be done arbitrarily and must be checked and certified by a professional organization; Especially when conducting outdoor operations under high temperatures, it is necessary to always pay attention to the abnormalities of the pump station; It is very normal for us to encounter some problems when using hydraulic boarding bridges as long as these problems are not very serious, we don't have to worry too much. However, when there is a problem with the hydraulic boarding bridge, once the relief valve is adjusted causing unnecessary casualties; 2. Do not adjust the overflow valve arbitrarily. Because every component in the hydraulic system operates at a specified pressure, it may cause abnormal operation of the hydraulic system, machines, and objects; Non professional personnel are not allowed to disassemble electrical appliances at will to prevent electric shock or incorrect connection.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

.Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation, and corrosion of steel wire ropes

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door


KefeldDC electric elevatorWhat are the technical conditions for selection and design



According to the needs of different performance genres,KefeldElectric water gate elevator, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, or a hall.

The impact load can cause early wear, fracture and fragmentation of mechanical structural components, as well as generate impact pressure in the hydraulic system, which in turn can damage hydraulic components,KefeldElectric elevator small, oil seals, and high-pressure oil

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

plan.Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.


KefeldDC electric elevatorWhat are the technical conditions for selection and design



Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

How much is it.According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, a T-shaped stage, or a hall.

Before each shift of work, the safety devices of the construction electric elevator should be inspected to ensure sensitivity and reliability.

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

Kefeld.Acceptance: Concrete strength grade C30, strength testing report.

Remind customers that there are still many areas to pay attention to when maintaining and maintaining the lifting platform. We also hope that customers and friends can pay more attention when using it to ensure the safety of personnel and property, regularly maintain and extend its service life, and create greater benefits for the enterprise. What is the matching degree of electric elevators? Everyone has always been confused. In short,Kefeld12 meter electric elevator, the matching degree of electric elevators is how the height of the electric elevator can be combined with the operating height. Electric elevators are not used frequently, so we must make it clear based on the actual operating height and actual load capacity when using electric elevators. If the frequency is too high, We suggest considering purchasing a guide rail electric elevator or a scissor fork electric elevator. The scissor fork electric elevator can achieve a maximum load capacity of 100 tons, which effectively solves the problem of load capacity. If the frequency of use is too high and the height is relatively high, we recommend using a guide rail electric elevator. This type of electric elevator is not easy to malfunction under high-frequency operation, By solving the load capacity and frequency of use, the matching problem of electric elevators is effectively solved. Concept of electric elevator rotary valve: The electric elevator rotary valve is a type of valve that quickly opens and closes, and the rotary valve can reduce oil pipeline channels and optimize line settings.

When the landing door is closed the full width of the lifting passage opening should be covered.