To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

When the foundation is set on the roof or floor structure,Finlo4 meter high electric elevator, the bearing capacity of its supporting structure should be checked.

Finlo.The down travel (limit) switch should be of the automatic reset type.

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements but safety should be maintained.

.The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts,Finlo6-12 meter fully automatic elevator, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.


FinloMobile small electric elevatorBasic type



Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove rubber or sponge from the buffer and cabin to increase their impact energy; Rope groove slipping and other accidents caused the car to suddenly fall, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator, there should be a safety device (such as a safety stop pin) to prevent people from suddenly falling when loading and unloading goods in the car; Electric elevators with three or more floors (including three floors) for passengers or passengers.

Check whether the sealing of components such as the oil cylinder, oil pipe, and motor of the aluminum alloy electric elevator is good and whether there is any air leakage.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Honest service.Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.


FinloMobile small electric elevatorBasic type



The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

how.The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

The inner bearing of the roller in the device is in good condition, and a complete grease film surface is maintained between the curved surface of the roller and the main chord of the aluminum alloy electric elevator. A good grease film surface can reduce wear and noise

Secondly, it is recommended to replace it every three months. If the frequency of use is not high,FinloSmall electric hydraulic elevator, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

Finlo.The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

The quality of the standard section should comply with the product manual and specification requirements.