KetaiThree wheel electric elevatorWhat is the custody of

announcer:hp935HP175192871 release time:2024-05-08 09:35:10

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, large load bearing capacity, and are relatively simple making them suitable for use in stage equipment.

Ketai.Limit switches should be triggered directly by the movement of the suspension cage or its related components.

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

.Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance,KetaiDecoration electric elevator,KetaiFire electric elevator, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts it is advisable to place the screw at the bottom and the nut at the top.


KetaiThree wheel electric elevatorWhat is the custody of



Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

The usual operation of landing and docking. The installation position of the upper limit switch should comply with the following: when the lifting speed is less than 0.8m/s, the upper safety distance L left after the upper limit switch is triggered by the hanging cage should not be less than

Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, and report any problems found to the user unit.

Direct material.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, smooth lifting and low noise.

Which one is better.The scaffolding of the parking platform should be laid tightly and firmly.

Setting requirements: The up travel (limit) switch should be able to automatically stop the cage running at the rated speed before reaching the upper limit switch, but should not trigger the up travel (limit) switch as high

Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.

Ketai.When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve,Ketai500kg electric elevator, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.