HenanElectric high-altitude elevatorTensile strength analysis

announcer:hp935HP175192871 release time:2024-05-07 11:59:40

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

The verticality of the guide rail frame should meet the requirements of the specifications.

Henan.Setting requirements: The up travel (limit) switch should be able to automatically stop the cage running at the rated speed before reaching the upper limit switch but should not trigger the up travel (limit) switch as high

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform and the lifting of goods should try to maintain a stable and uniform speed.

.Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.


HenanElectric high-altitude elevatorTensile strength analysis



To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve,HenanElectric elevator battery, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

Lower limit switch: In normal working state, before the suspension cage touches the buffer, the lower limit switch first acts.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

superior quality.The L distance depends on the selected wall mount model.

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Quality management.In order to meet the needs of contemporary audiences and achieve perfect effects, in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points, lighting suspension cages,HenanElectric hydraulic platform elevator, and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables,HenanElectric barrier free elevator, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout, meeting the needs of stage design and choreographers, creating special atmosphere and effects, and changing the stage form according to the needs of the performance.

Limit switches should be triggered directly by the movement of the suspension cage or its related components.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

Henan.Construction electric elevators outside the lightning protection range

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Installation and dismantling personnel and drivers should hold certificates to work.