The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology, smooth lifting and low noise.

In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings, a half height middle crossbar, and a toe board at least 150mm above the ground.

Dortmund.High altitude operations and maintenance in areas such as repair, logistics, electricity, petroleum, chemical, hotel, sports center, mining, also known as hydraulic lifting

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

.Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions,DortmundElectric mobile elevator, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

The entrance of each landing platform must be equipped with a landing door,DortmundMicro electric elevator, which must open towards the landing platform side and the door bolt must be set on the side next to the construction electric elevator.


Dortmund1 ton electric elevatorWave energy absorption effect



Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

The impact load can cause early wear, and fragmentation of mechanical structural components, as well as generate impact pressure in the hydraulic system, oil seals, and high-pressure oil

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

Quality assurance.Installation and dismantling personnel and drivers should hold certificates to work.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking,DortmundElectric mobile elevator, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.


Dortmund1 ton electric elevatorWave energy absorption effect



The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

For more, please check.Protective measures should comply with regulatory requirements.

The pressure joint between the pipe joint and the rubber hose fails prematurely, causing oil leakage or pipe explosion. The oil temperature rises due to frequent action of the overflow valve.

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., and the production should meet the design requirements.

Dortmund.The quality of the standard section should comply with the product manual and specification requirements.

It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform and high load-bearing capacity, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into 24V, 220V or 380V power supplies, diesel engines, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates, which have anti slip, insulation, and safety features. Please rest assured to use.

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.