AshburnThree meter electric elevatorNurtured by quality

announcer:hp935HP175192871 release time:2024-05-03 16:40:31

strength testing report.

Electric elevators used in various places.

Ashburn.Setting requirements: Construction electric elevators should be equipped with a down travel (limit) switch. The down travel (limit) switch should be able to automatically stop the cage running at rated speed before reaching the lower limit switch.

Acceptance: Concrete strength grade C30, strength testing report.

.Implementing multiple shifts of homework should fill in and submit records according to regulations.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.


AshburnThree meter electric elevatorNurtured by quality



Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places family dormitories, and

Attention should be paid to the occurrence of oil leakage on the aluminum alloy lifting platform to avoid secondary damage caused by a shortage of hydraulic oil. Overloading work is prohibited during use

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

Good quality.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications,AshburnElectric chain elevator, as specified in the above table.


AshburnThree meter electric elevatorNurtured by quality



Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Sincere service.Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

When adding hydraulic oil, it is also necessary to pay attention to the structure of the oil cylinder. Some oil cylinders are relatively complex internally, and how many lifting operations need to be carried out during filling to fully fill each position of the hydraulic oil. Therefore, when filling, try to add as much as possible, and then test and run the machine empty to see if it reaches the rated position.

The hydraulic oil forms a certain pressure by the vane pump and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

Ashburn.Setting requirements: For construction electric elevators with foundations installed on roof slabs,AshburnMultifunctional electric elevator, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.