When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting,KararaElectric pillar elevator, low noise, long service life large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.

Karara.The cargo is 0.5m.

Setting requirements: The landing door should be standardized and tooled.

.The landing door should meet the requirements of the specifications and achieve standardization.

Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.


KararaElectric elevator lifting platformProduction Process



The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

The usual operation of landing and docking.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Quality assurance.The landing door should meet the requirements of the specifications and achieve standardization.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances,KararaElectric elevator lifting 10 meters, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Before operating the construction electric elevator, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Karara.Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, etc., and the production should meet the design requirements.

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs it should not be used again to avoid accidents, personnel and property losses.

Acceptance: Concrete strength grade C30, strength testing report.