The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions,XinfuHigh altitude electric elevator, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

Xinfu.The device should be used within the valid calibration period and operate effectively and reliably. The anti fall safety device should have a valid inspection certificate (or inspection report), and the validity period should not exceed 1 year. Anti fall safety devices have been manufactured for five years

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

.When the wall bracket adopts non matching standard products, design calculations should be carried out.

Before operating the construction electric elevator routine inspections should be carried out according to regulations and inspection records should be filled out.

The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.


XinfuDingli Electric ElevatorThe basic structure of



The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

Check the starter potential when the lifting table is not raised or the voltage is too low when the motor load is working. Voltage hydraulic range allowed&

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.


XinfuDingli Electric ElevatorThe basic structure of



Before installation, the installation unit should confirm that the foundation,XinfuLarge electric elevator, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

new product.The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Before use, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

Xinfu.Installation and dismantling personnel and drivers should hold certificates to work.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts it is advisable to place the screw at the bottom and the nut at the top.

Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.