FenyangElectric elevatorUniversal application in all walks of life

announcer:hp935HP175192871 release time:2024-04-01 09:24:19

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Fenyang.The suspension cage movement can only be resumed after operator operation.

Protective measures should comply with regulatory requirements.

.Setting requirements: The landing door should be standardized and tooled.

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods,FenyangElectric pillar elevator, the operating failure rate can be reduced to a low level.

The L distance depends on the selected wall mount model.


FenyangElectric elevatorUniversal application in all walks of life



The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

The device should be used within the valid calibration period and operate effectively and reliably. The anti fall safety device should have a valid inspection certificate (or inspection report), and the validity period should not exceed 1 year. Anti fall safety devices have been manufactured for five years

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

Where is it.The scaffolding of the parking platform should be laid tightly and firmly.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.

Acceptance: Concrete strength grade C30, strength testing report.


FenyangElectric elevatorUniversal application in all walks of life



Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

how.The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

Alarm devices can be divided into fixed and mobile platforms, rail type and scissor type (curved arm type) to distinguish between overload or equipment malfunction. Fixed types include: scissor lift cargo elevator, chain electric elevator, and installation

Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

Fenyang.Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications,FenyangElectric wire rope elevator,FenyangElectric scissor type lifting platform, record the inspection results, and report any problems found to the user unit.

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.