ZhongshanElectric elevator mobile typeHow to judge good or bad with eyes

announcer:hp935HP175192871 release time:2024-03-30 11:57:17

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Zhongshan.Construction electric elevators should be equipped with travel limit switches,ZhongshanElectric small hydraulic elevator, as follows: automatic reset type upper and lower limit switches should be installed on construction electric elevators, but the upper and lower limit switches should not be triggered as high

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

.Mechanical devices controlled by cage movement should not be used to open or close the landing door.

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, sticky, or has foreign objects such as gravel it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, and then return it to the oil tank and connect the pipeline.


ZhongshanElectric elevator mobile typeHow to judge good or bad with eyes



Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Setting requirements: Construction electric elevators should be equipped with up travel (limit) switches.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Honesty is the foundation.A complete lifting platform accessory can be selected and customized according to different places, venues, and environmental usage conditions. Meet the needs of different users. So why lifting platforms can be used and installed in so many industries and places is because they can achieve multi-purpose, demonstrate multifunctional,ZhongshanElectric self-propelled elevator, meet various different needs, and win market demand. In modern industrial transportation processes, whether in airports, docks, warehouses, floors workshops and other places that require rapid loading and unloading of goods, they have played a very practical value, It has also brought great contributions to the entire industry and even the entire economic development. However, long-term operation and use of these devices inevitably lead to wear and consumption, and regular maintenance and upkeep are essential. Otherwise, both work efficiency and utilization rate will decrease, and at that time, the gains and losses will outweigh the losses.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.


ZhongshanElectric elevator mobile typeHow to judge good or bad with eyes



Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

Quality department.Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

The noise of aluminum alloy electric elevators during operation is relatively low. If the noise is high, it is abnormal. Therefore,ZhongshanSmall electric automatic elevator, it is necessary to do a good job in troubleshooting, find the cause in a timely manner, reduce noise pollution, and reduce dangerous accidents

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

Zhongshan.Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., making high-altitude operations easier

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)