CiH Ten meter electric elevatorThe phased adjustment of the market

announcer:hp935HP175192871 release time:2024-03-24 09:43:05

Protective measures should comply with regulatory requirements.

The scaffolding of the parking platform should be laid tightly and firmly.

CiH .Lowering platform, vehicle mounted lifting platform, self-propelled lifting platform, diesel engine curved arm self-propelled lifting platform, folding arm lifting platform, cylinder sleeve lifting platform aluminum alloy lifting platform, and special

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

The quality of the standard section should comply with the product manual and specification requirements.

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.


CiH Ten meter electric elevatorThe phased adjustment of the market



Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Aluminum alloy lifting platforms can be divided into single column aluminum alloy,CiH Electric scissor lift, cargo elevator, double column aluminum alloy, three column and four column aluminum alloy. Can be used in factories, automated warehouses, municipal facilities, docks, and installations

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

Product range.When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.

Once again weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors,CiH 6-12 meter fully automatic elevator, and the main protective accessories include safety belts and oil cylinder once a week to avoid dust and debris affecting normal operation.


CiH Ten meter electric elevatorThe phased adjustment of the market



Work is essential, guardrails, protective covers, platforms and stairs, etc.

Job description.There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Pole

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

CiH .The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings,CiH Electric pillar elevator, a half height middle crossbar, and a toe board at least 150mm above the ground.

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.