RajibriPlatform electric elevatorSome small knowledge in processing

announcer:hp935HP175192871 release time:2024-03-21 10:07:19

RajibriMobile small electric elevator,

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

The L distance depends on the selected wall mount model.

Rajibri.During maintenance or when problems occur, the power supply should be cut off in a timely manner. After lifting, the aluminum alloy electric elevator should be firmly fixed before maintenance can be carried out. It is strictly prohibited to operate with defects to avoid accidents.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

.The landing door should meet the requirements of the specifications and achieve standardization.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.


RajibriPlatform electric elevatorSome small knowledge in processing



It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, and high load-bearing capacity, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into 24V,RajibriElectric mobile elevator, 220V or 380V power supplies, diesel engines, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates which have anti slip, insulation, and safety features. Please rest assured to use.

Non automatic reset upper and lower limit switches should be installed at both the upper and lower ends of the stroke, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers),

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Development Curriculum.In order to meet the needs of contemporary audiences and achieve perfect effects,RajibriElectric elevator platform, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points, lighting bridges, lighting suspension cages, and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables and lifting orchestras. Some lifting platforms are equipped with turntables, or there are lifting platforms in the turntables. Various types of lifting platforms are equipped in professional opera houses, dance theaters, drama theaters and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout, meeting the needs of stage design and choreographers, creating special atmosphere and effects, and changing the stage form according to the needs of the performance.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, otherwise protective measures shall be taken.


RajibriPlatform electric elevatorSome small knowledge in processing



From the above comparison, low noise, long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.

Lets see.When the landing door is closed, the full width of the lifting passage opening should be covered.

The device should be used within the valid calibration period and operate effectively and reliably. The anti fall safety device should have a valid inspection certificate (or inspection report), and the validity period should not exceed 1 year. Anti fall safety devices have been manufactured for five years

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

Rajibri.When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.