Wieden 6-meter electric elevatorWhat are the new highlights of the work

announcer:hp935HP175192871 release time:2024-03-16 16:12:34

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator,Wieden Four meter electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, tighten the joint, remove the oil filter,Wieden Electric four-wheel elevator, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

Wieden .When using lifting equipment, the workbench should be kept in a horizontal state.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

.The quality of the standard section should comply with the product manual and specification requirements.

With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, and concrete strength report.


Wieden 6-meter electric elevatorWhat are the new highlights of the work



It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, and high load-bearing capacity, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into 24V 220V or 380V power supplies, diesel engines, using Italian and domestic hydraulic pump stations,Wieden Electric hydraulic elevator platform, and the table top is equipped with anti slip insulation buckle plates, which have anti slip, insulation, and safety features. Please rest assured to use.

. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, if

Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight greatly saving energy and reducing consumption.

Total quality management.Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Monthly maintenance and inspection of hydraulic lifting platform rollers intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.


Wieden 6-meter electric elevatorWhat are the new highlights of the work



Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., and the production should meet the design requirements.

Create brilliance.Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

The counterweight steel wire rope should be equipped with an anti loosening device that is sensitive and reliable.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, small size, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology, smooth lifting and low noise.