YuciElevator electric smallMain production process

announcer:hp935HP175192871 release time:2024-03-13 12:42:29

YuciMobile small electric elevator,

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Use floor doors and cage door devices on construction sites where conditions permit.

Yuci.A lifting platform with specifications ranging in height from 1 meter to 20 meters.

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.


YuciElevator electric smallMain production process



Setting requirements: The landing door should be standardized and tooled.

The installation position of the lower limit switch. The installation position of the lower limit switch should ensure that the contact plate triggers the switch when the rated load of the suspension cage decreases, causing the suspension cage to stop. At this time, the contact plate should also be close to the triggering of the lower limit switch

Installation and dismantling personnel and drivers should hold certificates to work.

Installation material list.Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories and

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

The scaffolding of the parking platform should be laid tightly and firmly.


YuciElevator electric smallMain production process



Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove rubber or sponge from the buffer and cabin to increase their impact energy; Rope groove slipping and other accidents caused the car to suddenly fall, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator, there should be a safety device (such as a safety stop pin) to prevent people from suddenly falling when loading and unloading goods in the car; Electric elevators with three or more floors (including three floors) for passengers or passengers.

Create brilliance.The foundation base or embedded parts should be fully embedded in the concrete foundation plate.

The body in the lateral adjustment device of the driving plate should ensure a compressed state, and ensure that the gear and rack always mesh well throughout the entire operation.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the operating failure rate can be reduced to a low level.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Low power consumption: When the hydraulic guide rail lifting platform descends it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.