Komarom 2 ton electric elevatorWhat

announcer:hp935HP175192871 release time:2024-02-27 09:37:25

Then the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

Komarom .Limit switches should be triggered directly by the movement of the suspension cage or its related components.

For customers to use and operate the lifting platform for a long time,Komarom Electric hydraulic elevator 15 meters, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

.Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation,Komarom Simple electric hoist cargo elevator, and corrosion of steel wire ropes

With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public,Komarom Electric three wheel elevator, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.


Komarom 2 ton electric elevatorWhat



Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

Do not move after lifting, and do not lift until the four legs are firmly supported.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

index.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Tower, Pavilion; Ideal props.

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.


Komarom 2 ton electric elevatorWhat



Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

Development Curriculum.The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Unloading platform and attached electric construction platform, etc.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Komarom .During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Manual pump: When the system malfunctions the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position