GansuBlue cover electric elevatorSee more

announcer:hp935HP175192871 release time:2024-02-25 09:46:55

design calculations should be carried out.

After the electric elevator passes the inspection

When the wall bracket adopts non matching standard products, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Gansu.When adding hydraulic oil, we can extend the oil cylinder to the high position for filling. When filling, the lifting platform should not exceed the high position, and then retract the oil cylinder back to the low position to check if the hydraulic oil level is lower than the low position, and maintain it between the two.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

.The net height of the landing door opening should not be less than 8m,GansuElectric hoist, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, should comply with the provisions of Table 4 of GB 23821-2009.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).


GansuBlue cover electric elevatorSee more



As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering, can achieve multiple points, and can be controlled up and down floors to achieve safe use.

The noise of aluminum alloy electric elevators during operation is relatively low. If the noise is high, it is abnormal. Therefore, find the cause in a timely manner, reduce noise pollution, and reduce dangerous accidents

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Trustworthy.When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.


GansuBlue cover electric elevatorSee more



The use of a lifting platform as a tool for storing performance blankets, soft scenery,GansuElevator manufacturer's electric elevator, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.

Executive standard.The scaffolding of the parking platform should be laid tightly and firmly.

Setting requirements: Steel wire rope electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the cage until it passes through the

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark,GansuElectric guide rail elevator, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

Gansu.Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.