Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator,LexlipElectric high-altitude elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Lexlip.Precautions during operation: Mechanical operations should be gentle and smooth, and mechanical operations should be avoided, otherwise impact loads will inevitably occur causing frequent mechanical failures and greatly shortening the service life. Generated during homework

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, it is advisable to place the screw at the bottom and the nut at the top.

.Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications,Lexlip2 meter high electric elevator, as specified in the above table.

The counterweight guide rail should meet the specification requirements.


LexlipSimple electric elevatorTensile strength analysis



Construction electric elevators outside the lightning protection range

The top of the hanging cage is accessible; d) During installation/disassembly/maintenance/inspection of the device; e) Inside the hanging cage.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Safety production.The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

Advantages of electric elevator rotary valve: Simplify the installation of electric elevator pipelines; The operation is more convenient, and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.


LexlipSimple electric elevatorTensile strength analysis



Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site,Lexlip3 meter electric elevator, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., and the production should meet the design requirements.

Inspection requirements.Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

Steel wire rope construction electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the lifting cage until it is approved by a professional

Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

Lexlip.Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

Double layer steel mesh: The diameter of the steel bars is 12mm