Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

Setting requirements: The installation and dismantling workers electricians,SosnoikElectric scissor lift, and other operators of construction electric elevators should have special construction operations.

Sosnoik.The isolation and buffering rubber in various parts of the aluminum alloy electric elevator drive device are intact and tightly fitted.

Horizontal lead screw mechanical electricity

.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness strength, stability, etc., and the production should meet the design requirements.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.


SosnoikSmall hydraulic electric elevatorPerformance comparison



Installation and dismantling personnel and drivers should hold certificates to work.

The body in the lateral adjustment device of the driving plate should ensure a compressed state, so that the gear has a certain radial constraint, and ensure that the gear and rack always mesh well throughout the entire operation.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean,SosnoikElectric water gate elevator, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

build.Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.


SosnoikSmall hydraulic electric elevatorPerformance comparison



Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation, and corrosion of steel wire ropes

Professional is king.Use floor doors and cage door devices on construction sites where conditions permit.

Setting requirements: A limit switch should be set at both the upper and lower ends of the stroke, which should be able to cut off the power supply before the suspension cage and other mechanical stop devices (such as buffers), the bearing capacity of its supporting structure should be checked.