AlvardenNiuli brand electric elevatorStrategies to prevent the influence of market trends

announcer:hp935HP175192871 release time:2024-01-22 13:05:15

which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places

Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), family dormitories, and

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

Alvarden.The counterweight steel wire rope should be equipped with an anti loosening device that is sensitive and reliable.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

.For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts,AlvardenElectric elevator 200kg, it is advisable to place the screw at the bottom and the nut at the top.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.


AlvardenNiuli brand electric elevatorStrategies to prevent the influence of market trends



The use of standard section connecting bolts should comply with the user manual and specification requirements.

When charging, it is necessary to charge it in a timely manner. When the equipment is used for about 2 months (according to the actual frequency of use), it is necessary to add grease to the rotating parts once; Regularly inspect the working status of the pin shaft of the fully self-propelled electric elevator every month, and if any pin shaft is found

Implementing multiple shifts of homework should fill in and submit records according to regulations.

Installation requirements.Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and concrete strength report.

Setting requirements: The wall bracket should use the manufacturer's matching standard products.

Construction electric elevators outside the lightning protection range


AlvardenNiuli brand electric elevatorStrategies to prevent the influence of market trends



Electric elevators used in various places.

resources.The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

The body in the lateral adjustment device of the driving plate should ensure a compressed state, so that the gear has a certain radial constraint, and ensure that the gear and rack always mesh well throughout the entire operation.

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area,AlvardenWarehouse electric elevator, improving the utilization rate of the wellbore area.

Alvarden.The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

The counterweight guide rail should meet the specification requirements.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.