HuvdopThree mast aluminum alloy elevatorVariety differentiation

announcer:hp750HP120486450 release time:2024-04-16 10:34:38

Regularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated.

When installing, disassembling, and adjusting the rotating mechanism,HuvdopAluminum alloy lifting rod, it is important to ensure that the centerline of the reducer of the rotating mechanism is parallel to the centerline of the gear, and its meshing surface is not less than 70%. The meshing clearance should be suitable.

Huvdop.1. Shaft section: It is a closed or mesh frame enclosed by buildings or lightweight steel structures, as well as service. Long term professional aluminum alloy elevator manufacturer

After working for 10000 hours, the mechanical and electrical systems of the elevator will be overhauled.

.Advantages: Due to the wide selection of electronic control switches, the aluminum alloy elevator with remote operation system can be operated remotely even on harsh construction sites, improving the comfort of operation and convenient walking. On the basis of traditional aluminum alloy elevators, steel bar transportation devices and concrete transportation devices are installed, which can transport steel bars, concrete, and workers greatly improving construction efficiency; The optional advanced stepless frequency control system enables the elevator to achieve stepless speed regulation of 0-60m/min.

Regularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated.

The aluminum alloy elevator with strong controllable performance is easy to operate and has high accuracy, which can meet the different needs of different heights, that is, press and stop, making high-altitude operations simple and feasible.


HuvdopThree mast aluminum alloy elevatorVariety differentiation



. Before the maintenance of the hydraulic aluminum alloy elevator starts, the tools used must be counted. After the maintenance is completed, the tools should be classified and organized, and counted to prevent the tools used for maintenance from being left inside the equipment, it is necessary to keep the maintenance site clean and dust-free. When repairing and fastening screws for aluminum alloy elevators, it is necessary to use the correct diagonal first. When tightening screws, use a torque wrench to prevent excessive damage to the screws. After the maintenance is completed and before the power on test, it is necessary to count the number of maintenance personnel to ensure that there is no one inside the aluminum alloy elevator. This is very necessary for the maintenance of large fixed hydraulic elevators. After counting the number of people, inspecting and repairing the equipment and the maintenance site, the power transmission test can only be carried out. After the maintenance of the aluminum alloy elevator is completed, the personnel participating in the maintenance, the maintenance items, the brand, model and specification of the replaced parts, the effectiveness of the maintenance, and whether the equipment still has problems after the maintenance is completed.

Features: Made of high-quality structural steel, with single-sided welding and double-sided forming process. The original imported hydraulic pump station or domestic joint venture hydraulic pump station is installed. The high-altitude operation lifting platform is equipped with safety devices such as balance valves and automatic pressure maintaining, making the platform safe, reliable, and durable. This series of elevators has the characteristics of flexible movement, stable lifting, large load capacity, and convenient operation. Usage: Curved arm aluminum alloy elevators can be divided into straight arm and curved arm according to the arm extension method. They are mostly used in places with high height requirements such as shipyards. These types of machines have good safety and easy movement, but the cost is high. Widely used for high-altitude operations and maintenance in factories, automated warehouses, parking lots, stations, airports, cinemas exhibition halls, docks, buildings, decoration, logistics, electricity, transportation, petroleum, chemical, hotels, industrial mines, enterprises, etc.

Test run or use completed. The aluminum alloy elevator and site must be cleaned. When closing the aluminum alloy elevator cover or other assembly cover. Items such as tools, rags, and removed parts should be checked for forgetting. After confirming that there are no errors. Only then can it be closed.

Workshop cost.Method: Check if the hydraulic oil in the mailbox is sufficient; Check if the oil filler cap of the fuel tank is excessively sealed, causing difficulty in oil pump suction. Check if the connection of the oil pump suction pipeline is loose to prevent air from the oil pump; Check whether the motor, cover, etc. are displaced, whether the fixing screws are loose and whether the ambient temperature of the equipment used meets the specified usage conditions. Air, cover check whether the motor, etc. are displaced, whether the fixing screws are loose, and whether the ambient temperature of the equipment used meets the specified usage conditions.

. Before the maintenance of the hydraulic aluminum alloy elevator starts, the tools used must be counted. After the maintenance is completed the tools should be classified and organized, and counted to prevent the tools used for maintenance from being left inside the equipment,HuvdopAluminum alloy platform car, especially in the distribution box. When repairing the hydraulic system of the aluminum alloy elevator, it is necessary to keep the maintenance site clean and dust-free. When repairing and fastening screws for aluminum alloy elevators, it is necessary to use the correct diagonal first. When tightening screws, use a torque wrench to prevent excessive damage to the screws. After the maintenance is completed and before the power on test, it is necessary to count the number of maintenance personnel to ensure that there is no one inside the aluminum alloy elevator. This is very necessary for the maintenance of large fixed hydraulic elevators. After counting the number of people inspecting and repairing the equipment and the maintenance site, the power transmission test can only be carried out. After the maintenance of the aluminum alloy elevator is completed, the equipment maintenance record must be filled out. The maintenance record should include the equipment maintenance date, the personnel participating in the maintenance, the maintenance items, model and specification of the replaced parts, the effectiveness of the maintenance, and whether the equipment still has problems after the maintenance is completed.

Multi mast aluminum alloy lifting platform: the whole platform is refined by high-strength aluminum profiles. Due to the high strength of the profiles, the four mast structure is adopted, which has excellent stability, large load capacity, large platform area and convenient implementation. Its appearance allows for high lifting capacity in extremely small spaces. Minimize the deflection of the lifting platform.


HuvdopThree mast aluminum alloy elevatorVariety differentiation



Secondly, frequent voltage instability can directly burn out the power unit motor. The consequences of motor burning are very serious, which can lead to an instant decrease in pressure. If the equipment is not equipped with safety devices such as relief valves or explosion-proof valves, it can cause the lifting equipment to fall, leading to accidents. At the same time, replacing a new power unit also requires a certain cost.

equipment maintenance .Is the power source noise abnormal during the lifting process of the aluminum alloy elevator?

There are more and more types of aluminum alloy elevators, including single masted aluminum alloy elevators, double masted aluminum alloy elevators, three masted main aluminum alloy elevators, four masted aluminum alloy elevators, and multi masted aluminum alloy elevators. The following is a specific introduction and explanation:.

Firstly, the maintenance process should be carried out on the premise of ensuring the safety of staff. Before repairing the aluminum alloy elevator, the power must be disconnected, and the power must be verified and hung up; No power transmission, people working&# quo; Identification plate for. During the maintenance process, it is not allowed to disconnect the grounding wire of the aluminum alloy elevator. If it is necessary for maintenance work, after the maintenance is completed, the grounding wire must be connected before the power test can be conducted. When replacing spare parts for aluminum alloy elevators, it is necessary to ensure that the spare parts are intact and of the same model. Items such as valves and seals should be placed in dry and dust-free packaging. When hydraulic aluminum alloy elevator maintenance requires entering the platform for internal work, after the aluminum alloy elevator is lifted, the working surface of the aluminum alloy elevator must be fixed or supported firmly with a crane or other equipment

Huvdop.Next, let's talk about the maintenance and upkeep of mechanical equipment for aluminum alloy elevators: the brakes of each mechanism should be regularly inspected and adjusted to ensure flexibility and reliability.

Advantages: Due to the wide selection of electronic control switches, the aluminum alloy elevator with remote operation system can be operated remotely even on harsh construction sites, improving the comfort of operation and convenient walking. On the basis of traditional aluminum alloy elevators, steel bar transportation devices and concrete transportation devices are installed, which can transport steel bars, concrete, and workers, greatly improving construction efficiency; The optional advanced stepless frequency control system enables the elevator to achieve stepless speed regulation of 0-60m/min.

Method: Check if the hydraulic oil in the mailbox is sufficient; Check if the oil filler cap of the fuel tank is excessively sealed, causing difficulty in oil pump suction. Check if the connection of the oil pump suction pipeline is loose to prevent air from the oil pump; Check whether the motor, cover, etc. are displaced, whether the fixing screws are loose,HuvdopAluminum alloy lifting frame ladder, and whether the ambient temperature of the equipment used meets the specified usage conditions. Air, check whether the motor, cover, etc. are displaced, whether the fixing screws are loose, and whether the ambient temperature of the equipment used meets the specified usage conditions.