The development of elevators is at its peak, as many manufacturers have chosen more multi-story buildings to fully utilize the site, so they also need a device to facilitate the improvement of goods.

Stable and widely applicable cargo lifting equipment is mainly used for transporting goods between height differences in production lines; Material online and offline; Adjust the height of the workpiece during assembly; High altitude feeder feeding; Lifting of components during assembly of large equipment; Large machine material and cutting; The warehouse loading and unloading site is equipped with forklift and other transportation vehicles for rapid loading and unloading of goods.

El Prague.What technical issues are required for the installation of hydraulic freight elevators? The installation of hydraulic freight elevators is actually quite complex. If you do not understand the equipment pictures designed by the elevator manufacturer and the detailed situation of the hydraulic freight elevator designed by the elevator manufacturer, installation errors may occur, leading to equipment failure of the freight elevator! When installing hydraulic freight elevators it is necessary to accurately calculate the size of the pit. The guide rail hydraulic freight elevator is a freight elevator composed of chains, guide rail torque tubes, and other components,El PragueHydraulic guide rail lifting platform, mainly driven by the chain to assist in the upward and downward telescopic lifting of the freight elevator. The pulleys at the four corners of the countertop should be fixed on the surrounding guide rails. The entire elevator equipment is installed on the wall, and wall mounted installation is chosen to enhance the stability of the freight elevator. Choosing the appropriate wall size also requires careful planning.

The elevator is evenly distributed at any position on the guide rail at 150% of the maximum load capacity, and should be stable at the maximum lifting height.

.The cylinder head oil seal is too tight or the rod is bent, which can also cause noise during movement due to other forces. At this point, the oil seal or straightening rod must be replaced in a timely manner.

Check valve leakage: If the natural wear of the check valve exceeds the specified value after long-term use, it will cause leakage. Disassemble and clean the check valve, and replace it if necessary.

Considering the oil level in the oil tank when all hydraulic cylinders in the system are extended, the oil level in the oil tank should not be lower than the Z-low oil level, and when the oil cylinders retract, the oil level should not be higher than the Z-high oil level. In fact, most manufacturers have noticed the above issues. The reason for the introduction is that most users can learn more about the equipment itself when using elevators, in order to facilitate equipment maintenance. Hydraulic cargo elevator manufacturers sincerely hope that you choose a legitimate manufacturer when purchasing elevators, to avoid any worries about after-sales service.


El PragueElectric fixed hydraulic lifting platformEquipment quality and reliability construction level



Lifting mechanism: The workbench should be ensured to rise and fall smoothly, and there should be no jumping lifting phenomenon. All moving parts should be flexible when moving, and there should be no jamming devices. The lifting system of the elevator is divided into electric or manual hydraulic systems, and there should be no leakage at all components, pipelines, and joints.

The safety belt should be inspected before use and a static load test should be conducted regularly (every 6 months). The load for the boarding bridge test is 225 kilograms, and the test time is 5 minutes. After the test, check for deformation, etc., the wholesale manufacturers of hydraulic elevators remind that there are three main ways to adjust the speed control circuit: throttling speed control circuit: quantitative pump oil supply, using flow valves to adjust the flow in and out of the actuator to achieve speed control; In the volume throttling speed control circuit, the oil is supplied by the pressure limiting variable pump, and the flow rate into the actuator is adjusted by the flow valve to adapt the flow rate of the variable pump to the regulated flow rate of the speed control valve.

Selection of the location of the loading and unloading lifting platform In order to reduce the cost of material handling, the location of the platform should be selected to minimize the distance of the handling tools and vehicles in the factory. It is much easier to move a fully loaded transport vehicle to a designated location outside the building than to transport the loaded materials one by one to the designated location indoors. When selecting a platform location, full consideration should be given to the production process and operational needs of the factory. There are two modes of platform layout: merging: loading and unloading on the same platform.

Separate: Loading and unloading on different platforms.


El PragueElectric fixed hydraulic lifting platformEquipment quality and reliability construction level



When the hydraulic lifting platform is working, the load cannot exceed its rated load. When it is raised to a certain height, the larger the mass of the object, the greater the shaking

Test results.The characteristics of the platform include reliable hydraulic system, simple operation, large load-bearing capacity, and rear hinge support.

The manufacturer of hydraulic cargo elevators tells you the reason for the instability of hydraulic lifting equipment. Hangzhou hydraulic cargo elevator equipment has always had good stability,El PragueTwo ton hydraulic lifting platform, mainly used for heavy types of goods. However, during use, Hangzhou hydraulic cargo elevators may inevitably encounter some faults during the lifting process, and the lifting power of the platform is a two machine or three-phase power supply. It has manual and electric power, and is also equipped with a hand pump for use in case of power outage. This series of platforms have the characteristics of flexible movement stable lifting, and easy operation,El Prague20 meter hydraulic lift, and are mainly used in factories, government agencies, commercial stores, and the construction and decoration industry.

El Prague.The elevator is evenly distributed at any position on the guide rail at 150% of the maximum load capacity, and should be stable at the maximum lifting height.