The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Emergency manual valve: In case of power failure, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.

When the wall bracket adopts non matching standard products, design calculations should be carried out.

Secondly, for the replacement of hydraulic oil on the lifting platform,MarseilleElectric hydraulic elevator, it is recommended to replace it every three months. If the frequency of use is not high, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.


MarseilleElectric elevatorAnalysis of operational matters



Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

Unloading platform and attached electric construction platform etc.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

average method.In order to meet the needs of contemporary audiences and achieve perfect effects,Marseille1 ton electric elevator, in addition to lighting and sound, stage machinery is particularly important on the stage. On the stage, there are suspension rods, suspension points lighting bridges, lighting suspension cages, and fire curtains. Under the stage, there are lifting platforms, car platforms, turntables, and lifting orchestras. Some lifting platforms are equipped with turntables, dance theaters, drama theaters, and many internationally renowned music halls. It has the functions of quickly changing scenery, meeting the needs of stage craft layout, meeting the needs of stage design and choreographers, creating special atmosphere and effects, and changing the stage form according to the needs of the performance.

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires,MarseilleElectric elevator 10 meters, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.


MarseilleElectric elevatorAnalysis of operational matters



Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

The cost is reasonable.Implementing multiple shifts of homework should fill in and submit records according to regulations.

The device should be used within the valid calibration period and operate effectively and reliably. The anti fall safety device should have a valid inspection certificate (or inspection report), and the validity period should not exceed 1 year. Anti fall safety devices have been manufactured for five years

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements but safety should be maintained.

Marseille.Use floor doors and cage door devices on construction sites where conditions permit.

The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops