Work is essential, and the main protective accessories include safety belts, guardrails, platforms and stairs, etc.

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process,ShanghaiElevator electric 6 meters, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.

Shanghai.The top of the hanging cage is accessible; d) During installation/disassembly/maintenance/inspection of the device; e) Inside the hanging cage.

Installation and dismantling personnel and drivers should hold certificates to work.

.The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

The counterweight guide rail should meet the specification requirements.

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower,ShanghaiElectric hydraulic elevator platform, Pavilion; Ideal props.


ShanghaiSmall mobile electric elevatorWill face great challenges



The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

The shutdown device (emergency stop switch) should be non automatic reset type.

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

retailer.When the door is closed,ShanghaiElectric elevator small, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications record the inspection results, and report any problems found to the user unit.


ShanghaiSmall mobile electric elevatorWill face great challenges



Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

safety requirements .Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.

The working principle of the aluminum alloy lifting platform is that hydraulic oil is composed of a vane pump to form a certain pressure, which enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.