Implementing multiple shifts of homework should fill in and submit records according to regulations.

The wall bracket of the construction electric elevator should be intact and reliably fixed and its attachment distance,Balbrigan10 meter electric lifting platform, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and verified by experts.

Balbrigan.Construction electric elevators should be equipped with travel limit switches, as follows: automatic reset type upper and lower limit switches should be installed on construction electric elevators, but the upper and lower limit switches should not be triggered as high

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

.It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, and high load-bearing capacity, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into 24V, 220V or 380V power supplies, diesel engines, and the table top is equipped with anti slip insulation buckle plates, which have anti slip, insulation, and safety features. Please rest assured to use.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.


BalbriganDingli Electric ElevatorNew device can improve performance



To ensure safe and reliable braking of the lifting platform and prevent accidents,BalbriganFloor electric elevator, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

Items and other miscellaneous items.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

Where is it.Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.


BalbriganDingli Electric ElevatorNew device can improve performance



Once again,BalbriganElevator electric 6 meters, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

original.During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

The coaxiality between the motor shaft and the worm shaft in the aluminum alloy electric elevator drive device should be less than 0.1mm, and there should be a 2mm gap at the shaft end to ensure that the motor bearings bear reasonable loads and reduce motor operating noise; electric

The verticality of the guide rail frame should meet the requirements of the specifications.

Balbrigan.Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).