Tanobjeg10 meter electric elevatorInstallation coordination attention elements

announcer:hp935HP175192871 release time:2024-01-07 11:31:23

TanobjegHand propelled electric elevator,

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Tanobjeg.When charging, it is necessary to charge it in a timely manner. When the equipment is used for about 2 months (according to the actual frequency of use), it is necessary to add grease to the rotating parts once; Regularly inspect the working status of the pin shaft of the fully self-propelled electric elevator every month, and if any pin shaft is found

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

.Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points,TanobjegPortable electric elevator, and can be controlled up and down floors to achieve safe use.

Setting requirements: The landing door should be standardized and tooled.


Tanobjeg10 meter electric elevatorInstallation coordination attention elements



Mechanical devices controlled by cage movement should not be used to open or close the landing door.

Setting requirements: Buffers should be installed below the suspension cage and counterweight running channel.

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

Market trend.Electric elevators used in various places.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, hydraulic control one-way valve, throttle valve,TanobjegScissor fork electric elevator, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.


Tanobjeg10 meter electric elevatorInstallation coordination attention elements



Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, the Electrical safety device shall stop the operation of the electric lift.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it can automatically cut off the oil circuit and stop descent

Implementing multiple shifts of homework should fill in and submit records according to regulations.

Construction electric elevators outside the lightning protection range


it is advisable to place the screw at the bottom and the nut at the top.

Tanobjeg.Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends