DortmundElectric elevator 10 metersCity application analysis

announcer:hp935HP175192871 release time:2023-12-21 12:45:21

The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

Dortmund.Normal operation starts. Click on this free download of construction technical information. Safety limit devices should be installed on electric elevators for construction, with upper and lower limit switches that are sensitive and reliable.

Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places family dormitories, and

.The use of standard section connecting bolts should comply with the user manual and specification requirements.

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.


DortmundElectric elevator 10 metersCity application analysis



Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

A lifting platform with specifications ranging in height from 1 meter to 20 meters.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

Honest service.Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Stage equipment safety door. To prevent personnel from extending their heads, hands,DortmundPure electric curved arm elevator, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than 8 meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors,DortmundSmall and simple electric elevator, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.


DortmundElectric elevator 10 metersCity application analysis



Before operating the construction electric elevator,DortmundElectric elevator 6 meters, routine inspections should be carried out according to regulations and inspection records should be filled out.

Honest service.Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

The working principle of the aluminum alloy lifting platform is that hydraulic oil is composed of a vane pump to form a certain pressure, throttle valve explosion-proof electromagnetic directional valve, hydraulic control one-way valve, and balance valve

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Dortmund.Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points