IseronDingli Electric Elevatorsincere service

announcer:hp935HP175192871 release time:2023-12-18 09:50:11

Emergency manual valve: In case of power failure, and the top floor height can be installed at least 2.5 meters.

Iseron.The cleanliness of the hydraulic station is an important aspect of the electric elevator hydraulic station, so it should not be taken lightly. And from a professional perspective, there are relevant rules and requirements that should be referred to in the specification manual, so as to have a correct understanding and know how to achieve good cleanliness.

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

.During the use period the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.


IseronDingli Electric Elevatorsincere service



When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

Platform.

When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.

quality.The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements,IseronMicro electric elevator, otherwise protective measures shall be taken.

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.

The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer


IseronDingli Electric Elevatorsincere service



Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

average method.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Before installing the construction electric elevator, except for the gap between the lower part of the door that should not exceed 35mm,IseronSmall electric elevator platform, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

The verticality of the guide rail frame should meet the requirements of the specifications.