SeksadThree meter electric elevatorDebugging process and general requirements

announcer:hp935HP175192871 release time:2023-12-17 09:14:53

Later, when there is a major malfunction of the lifting platform it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

Seksad.High altitude operations and maintenance in areas such as repair, logistics, electricity, transportation, petroleum, chemical, hotel, sports center, mining, and enterprise. The lifting system of the lifting platform is driven by hydraulic pressure, also known as hydraulic lifting

Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation, wide working platform, and high load-bearing capacity, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into 24V, 220V or 380V power supplies, diesel engines using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates, which have anti slip, and safety features. Please rest assured to use.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

The scaffolding of the parking platform should be laid tightly and firmly.


SeksadThree meter electric elevatorDebugging process and general requirements



Electric elevators used in various places.

Greater than 0.04s; When the hydraulic buffer is used, the oil level shall be checked, and the action of the hydraulic buffer shall be monitored by the Electrical safety switch. When the hydraulic buffer is compressed,Seksad6-meter electric elevator,SeksadFully electric scissor lift, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

Project scope.Braking. The brake limit switch for partial motion control of the electric hoist traction machine. Assembly that restricts the operation of the lift car when it is opened to a high or low position; If the limit switch controls the overtravel switch. When the car travels to a high or low position, it will take on the function of raising or lowering. In order to prevent the lift car from crashing or sinking, stage equipment should be dismantled with over travel switches that can cut off power and cannot be automatically reset, and installed in the machine room, rather than in the shaft; A buffer should be installed that can absorb the energy of the moving mechanism and reduce impact.

Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.


SeksadThree meter electric elevatorDebugging process and general requirements



The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Inspection items.Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

The usual operation of landing and docking.

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

Seksad.Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

Before operating the construction electric elevator routine inspections should be carried out according to regulations and inspection records should be filled out.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.