SalenoElectric elevator lifting platformThe protective effect of the superior performance

announcer:hp935HP175192871 release time:2023-11-15 15:42:29

From the perspective of the safety performance of the machinery itself, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

Saleno.Lower limit switch: In normal working state, before the suspension cage touches the buffer, the lower limit switch first acts.

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.

.The verticality of the guide rail frame should meet the requirements of the specifications.

Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.


SalenoElectric elevator lifting platformThe protective effect of the superior performance



Construction electric elevators outside the lightning protection range

The shutdown device (emergency stop switch) should be non automatic reset type.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, large load bearing capacity and are relatively simple, making them suitable for use in stage equipment.

Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

Later, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.


SalenoElectric elevator lifting platformThe protective effect of the superior performance



After the electric elevator passes the inspection,SalenoElectric scissors elevator, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting,SalenoMicro electric elevator, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Quality management.There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, if

Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

Saleno.The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

When the door is closed,Saleno3 meter electric elevator, except for the gap between the lower part of the door that should not exceed 35mm any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.