Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

San Jose.Items and other miscellaneous items.

Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness,San JoseElectric cargo elevator, strength,San JoseElectric mobile hydraulic elevator,San JoseFully automatic elevator electric, stability, etc., and the production should meet the design requirements.

.Protective measures should comply with regulatory requirements.

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops


San Jose6-12 meter fully automatic elevatorToday



Mechanical devices controlled by cage movement should not be used to open or close the landing door.

The safety overtravel of limit switches and upper limit switches should comply with regulatory requirements.

The landing door should meet the requirements of the specifications and achieve standardization.

Interpretation and observation.Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

Setting requirements: The landing door should be standardized and tooled.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.


San Jose6-12 meter fully automatic elevatorToday



Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

Promise and keep promise.Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Unloading platform and attached electric construction platform, etc.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

San Jose.Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.