The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

Installation and dismantling personnel and drivers should hold certificates to work.

Mishkoltz.Check whether the sealing of components such as the oil cylinder, oil pipe, and motor of the aluminum alloy electric elevator is good and whether there is any air leakage.

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

.When the wall bracket adopts non matching standard products, design calculations should be carried out.

Implementing multiple shifts of homework should fill in and submit records according to regulations.

Installation and dismantling personnel and drivers should hold certificates to work.


MishkoltzElectric brick elevator on construction siteExternal elements of compressive strength



Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, it is necessary to add grease to the rotating parts once; Regularly inspect the working status of the pin shaft of the fully self-propelled electric elevator every month, and if any pin shaft is found

During normal operation the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

ranking.The scaffolding of the parking platform should be laid tightly and firmly.

In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings,MishkoltzWarehouse electric elevator, a half height middle crossbar,Mishkoltz2 meter micro electric lifting platform, and a toe board at least 150mm above the ground.

Then, the lifting platform platform platform that carries the load needs to be balanced and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.


MishkoltzElectric brick elevator on construction siteExternal elements of compressive strength



The use of standard section connecting bolts should comply with the user manual and specification requirements.

Test results.The quality of the standard section should comply with the product manual and specification requirements.

Precautions for safe use of electric elevators: Before use,MishkoltzMicro electric elevator, remove any obstacles or debris near the electric elevator that may hinder operation, and check whether the operating handle can be used normally.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Mishkoltz.Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.

Use floor doors and cage door devices on construction sites where conditions permit.