Hyelia4 meter high electric elevatorBusiness plan template

announcer:hp935HP175192871 release time:2024-09-04 10:09:03

Mechanical devices controlled by cage movement should not be used to open or close the landing door.

Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method,HyeliaElectric elevator factory, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Tower, Pavilion; Ideal props.

Hyelia.Electric elevators should be regularly maintained and cleaned. During maintenance and cleaning,HyeliaMobile small electric elevator,HyeliaElevator scissor electric, the bracket should be supported to prevent the electric elevator from overturning. Electrical and hydraulic systems should be maintained by professional personnel; When the battery level display is less than 40%

The counterweight guide rail should meet the specification requirements.

.To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of 8 meters by 2 meters.

The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.


Hyelia4 meter high electric elevatorBusiness plan template



Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

The use of fully autonomous electric elevators can create more benefits and ensure safety in all aspects.

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

agent.The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

The setting of the cable guide frame should comply with the user manual and regulatory requirements.


Hyelia4 meter high electric elevatorBusiness plan template



Later, when there is a major malfunction of the lifting platform it should be repaired by professional personnel as soon as possible. After the malfunction occurs, it should not be used again to avoid accidents, personnel and property losses.

Manufacturing cost.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

When charging, it is necessary to charge it in a timely manner. When the equipment is used for about 2 months (according to the actual frequency of use), and if any pin shaft is found

During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

Hyelia.The net height of the landing door opening should not be less than 8m, the size of any through-hole and opening related to the distance between any door and adjacent moving parts except for the gap between the lower part of the door that should not exceed 35mm, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

The quality of the standard section should comply with the product manual and specification requirements.