ministerThree wheel electric elevatorSurface structure and processing technology

announcer:hp935HP175192871 release time:2024-08-28 18:07:55

ministerSmall electric automatic elevator,

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

minister.Safety devices: Electric elevators for construction should be equipped with overload detection devices. When the load inside the cage exceeds 10% of the rated load capacity, the overload detection device will give a warning signal inside the cage,

The L distance depends on the selected wall mount model.

.The verticality of the guide rail frame should meet the requirements of the specifications.

Use floor doors and cage door devices on construction sites where conditions permit.

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve,ministerRechargeable electric elevator, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.


ministerThree wheel electric elevatorSurface structure and processing technology



Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods,minister6 meter high electric elevator, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

Is there a relevant rule requirement for the cleanliness of hydraulic stations?

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

device management.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.


ministerThree wheel electric elevatorSurface structure and processing technology



To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable so that the entire platform does not have a height difference, ensuring the safety of the cast members.

How much does it cost?.Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, and the source of power for the hydraulic system is hydraulic oil. Only when the hydraulic oil quantity is sufficient and the oil quality is high, can the folding arm electric elevator provide greater torque output, how can we determine whether the newly added hydraulic oil quantity is sufficient? What is the hydraulic oil quantity standard?

The quality of the standard section should comply with the product manual and specification requirements.

minister.Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.